Year : 2019
Location : Jirak, Sumatera
Client : PT. Pertamina EP
Scope of work :
EPC for Jirak Field Production and Injection Facilites, Included :
- Produced Water System
- Treated Water System
- Demulsifier Injection Package
- Pretreatment System
- Filtration (Nutshell) System
- Chemical Injection System
- FWKO (Free Water Knock Out System)
- Utility System
- modification of existing tanks and manufacture of new tanks
- Water Injection System
- Oil Storage and Transfer system
- Power Generation System
- SCADA System / Telemetering
- Fire protection system
- Electrical, Instrument and control system
- Piping system including valve, fittings and Bulk material
- integration and interfacing with existing facility systems
- construction of control rooms, operator rooms, civil works and supporting infrastructure
- Pre – commissioning , commissioning and start – up
Product Installed :
- Demulsifier
- Filtration System
- Storage Tanks
- Scada System
- Electrical, Instrument , Control System
- Valve, Fittings
Jl. Wibawa Mukti No. 89
P: +62 21 2938 8858
F: +62 21 2938 8859
Jl. Wibawa Mukti No. 34
P: +6221 822 1694
F: +6221 822 3942
Jatiasih - Bekasi 17425,
Indonesia
www.pratiwi.com | info@pratiwi.com
Ilham Caesar Putra
bd@pratiwi.com
Elvira Agustina
elvira@pratiwi.com