< Back to Complete Project

No items found.

Construction of Jirak Field Production dan Injection Facilities Jirak Field, 2019

Year                 : 2019

Location          : Jirak Field, South Sumatera

Client               : PT. Pertamina EP

Scope of work :

EPC for Jirak Field Production and Injection Facilites, Included :

- Produced Water System

- Treated Water System

- Demulsifier Injection Package

- Pretreatment System

- Filtration (Nutshell) System

- Chemical Injection System

- FWKO (Free Water Knock Out System)

- Utility System

- modification of existing tanks and manufacture of new tanks

- Water Injection System

- Oil Storage and Transfer system

- Power Generation System

- SCADA System / Telemetering

- Fire protection system

- Electrical, Instrument and control system

- Piping system including valve, fittings and Bulk material

- integration and interfacing with existing facility systems

- construction of control rooms, operator rooms, civil works and supporting infrastructure

- Pre – commissioning , commissioning and start – up

Product Installed :

- Demulsifier

- Filtration System

- Storage Tanks

- Scada System

- Electrical, Instrument , Control System

- Valve, Fittings

PT. Pratiwi Putri Sulung

Office :

Jl. Wibawa Mukti No. 89
P: +62 21 2938 8858
F: +62 21 2938 8859

Workshop :

Jl. Wibawa Mukti No. 34
P: +6221 822 1694
F: +6221 822 3942

Jatiasih - Bekasi 17425,
Indonesia
www.pratiwi.com | info@pratiwi.com

Contact Person

Bussiness Development :

Ilham Caesar Putra
bd@pratiwi.com

Sales and Marketing :

Elvira Agustina
elvira@pratiwi.com