Gas Receiving Station 90 MMSCFD, 2019

Client      : Cikarang Listrindo.
Year        : 2019
Location : Jababeka, Cikarang

Scope of work :

EPC for the construction of a new gas receiving station at their power station in Jababeka

Product Installed :
- Gas Scrubber
- 16 “ ESD ( Emergency Shutdown Valve)
- 8” Valve Venting
-  Flow Meter Skid Including Bypass Valve
-  Flare Stack