Project Overview

This distribution facility includes a pipeline approximately 12 km long, stretching from Perawang Station to IKPP Station. This pipeline passes through three different areas, namely the TGI, ARARA, and IKPP regions. The natural gas supplied comes from the Grissik - Duri Transmission Pipeline owned by PT Transport Gas Indonesia, which will be connected to the IKPP Station through two metering stations, one substation, and a pipeline system.

The project includes the construction of the EHK Perawang Metering Station, Perawang Substation, and IKPP Metering Station. The EHK Perawang Metering Station serves as the starting point, with the Perawang Substation next to it, and ending at the IKPP Metering Station.

Scope of Work :

‍Procurement

Civil Works

Mechanical & Piping

Electrical & Instrumentation

Pipeline Construction

Commissioning

PT. Pratiwi Putri Sulung

Office :

Jl. Wibawa Mukti No. 89
P: +62 21 2938 8858
F: +62 21 2938 8859

Workshop :

Jl. Wibawa Mukti No. 34
P: +6221 822 1694
F: +6221 822 3942

Jatiasih - Bekasi 17425,
Indonesia
www.pratiwi.com | info@pratiwi.com

Contact Person

Sales and Marketing :

Elvira Agustina
elvira@pratiwi.com